• Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry
  • Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry
  • Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry
  • Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry

Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry

Function: Water Boiler, Steam Boilers
Fuel: Waste Heat
Installation: Assembled Boiler
Structure: Water Tube
Media: Steam and Water
Water Circulation: Forced Circulation
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Shandong, China
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Overseas Services
The supplier provides overseas services and supports countries including Bangladesh.

Overseas service content includes Debugging, Training, Equipment Installation, Repair, Maintain.
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (28)

Basic Info.

Model NO.
KNPT
Drum Placement
Vertical Boiler
Pressure
Pressure
Manufacturing Level
B
Burning Style
Waste Heat
Usage
Industrial, Power Station
Operating Pressure
0.5MPa~3.8MPa
Fit for
Ore Smelting Electric Arc Furnace
Heat Efficiency
>95%
Transport Package
Standard Export Package
Specification
Customize
Trademark
Kaineng
Origin
China
HS Code
840212
Production Capacity
1000 Sets /Year

Product Description

Big Size Vertical HRSG Power Generation Waste Heat Boiler Equipment For Mining Industry

Description of Waste Heat Steam Generator Boiler:

The waste heat steam generator boiler adopts forced circulation, that is, steam and water working fluid are driven by external force (feed water pump, hot water circulation pump) in the pipe. This can make the heating surface layout very compact and without any restrictions.
 
Heating surface of waste heat steam generator boiler usually consists of following  3 parts:
1 Economizer
2 Evaporator
3 Superheater

The waste heat steam generator boiler is installed on the flue duct of the Ore smelting electric arc furnace tail to achieve the purpose of recovering flue gas heat and protecting the environment. It is of great practical significance to effectively reduce energy consumption and promote the sustainable development of renewable energy.

The Steam Capacity of The waste heat steam generator boiler:
Waste heat steam boiler (WHRB) are offered in tailor-made capacities as per customer requirement
 
Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry

Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry
 
Waste Heat Power Generation Boiler parameter (Below parameter is for reference only, Waste Heat Boiler Customization Available):
 
S.N Parameters Description
1 Exhaust gas flow 157000Nm3/h
2 Exhaust gas inlet 280ºC
3 Steam capacity 8.5t/h
4 Operating pressure (MPa) 0.8 MPa
5 Design pressure (MPa) 0.9 MPa
6 Rated steam temperature 175.4ºC
7 Exhaust gas outlet 160ºC
8 Pressure drop <1200Pa
 
Benefits of Exhaust Gas Boiler for Ferroalley Furnace:
1 Highly reliable in operation and robust in construction.
2 Quick Payback Returns are achieved.
3 One time investment with lifetime returns.
4 No combustion, No emission hence Eco-friendly.
5 Energy being put to use, which was getting wasted anyway.


Transportation of Kaineng Waste Heat Boiler :
Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry

Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper exhaust gas boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
 
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
 
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.


Kaineng Factory Area 
Big Size Vertical Hrsg Power Generation Waste Heat Boiler Equipment for Mining Industry

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now