• Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
  • Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
  • Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines

Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines

Function: Steam Boilers, Waste Heat Boiler
Fuel: Waste Heat
Installation: Packaged Boiler
Structure: Water Tube
Media: Steam and Water
Water Circulation: Forced Circulation
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Shandong, China
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Overseas Services
The supplier provides overseas services and supports countries including Bangladesh.

Overseas service content includes Debugging, Training, Equipment Installation, Repair, Maintain.
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (28)

Basic Info.

Model NO.
KNGT
Drum Placement
Vertical Boiler
Pressure
Low Pressure
Manufacturing Level
A
Burning Style
Chamber Combustion Boiler
Usage
Industrial, Power Station
Transport Package
Standard Export Package
Trademark
Kaineng
Origin
China
HS Code
8402120090
Production Capacity
1000 Sets /Year

Product Description

China Factory Supply Water Tube Exhaust Gas Boiler HRSG for 1MW to 40 MW Gas Turbines

Kaineng Exhaust Gas Boiler Systems offers a full range of custom designed HRSG boiler systems to meet most demanding requirements.


 
1. Custom engineered exhaust gas boiler HRSG for gas turbines from 1MW to 40 MW
2. Factory assembled natural circulation water tube designs
3. Single or multiple boiler pressure designs
4. Boiler design features to accommodate high cycling operation
5. Feed-water and condensate heaters for maximum heat recovery
6. China Kaineng is the industry leader for exhaust gas boiler for gas turbines up to 40 MW. We offer designs based on application and operating conditions.
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines





Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
Advantages of exhaust gas boiler for gas turbine:
1) The heat exchange efficiency is up to 98%;
2) Small size, light weight and low investment;
3) Service life is more than 20 years;
4) The structure is designed to resist vibration and noise;
5) The minimum investment payback period is 4 months;
6) Complete shop assembly to minimize installation cost
7) Easy operation and maintenance;



Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines




 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines



Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper exhaust gas boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
 
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
 
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines



Kaineng Factory Area 
Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines

Factory Supply Water Tube Exhaust Gas Boiler Hrsg for 1MW to 40 MW Gas Turbines
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now