• Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns
  • Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns
  • Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns
  • Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns

Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns

Function: Water Boiler, Steam Boilers
Fuel: Waste Heat
Installation: Assembled Boiler
Structure: Water Tube
Media: Organic Heat Transfer Material
Water Circulation: Natural Circulation
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2014

Suppliers with verified business licenses

Shandong, China
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Overseas Services
The supplier provides overseas services and supports countries including Bangladesh.

Overseas service content includes Debugging, Training, Equipment Installation, Repair, Maintain.
OEM Services
The supplier provides OEM services for popular brands
to see all verified strength labels (28)

Basic Info.

Model NO.
KNYL
Drum Placement
Vertical Boiler
Pressure
Low Pressure
Manufacturing Level
Class a
Burning Style
Waste Heat
Usage
Industrial, Power Station
Brand
Kaineng
Certification
ISO 9001
Price
Cheap
Material
Carbon Steel
Transport Package
Wood Case or Iron Frame
Specification
SGS, BV, GL, LR
Trademark
kaineng
Origin
Qingdao, China
Production Capacity
100PCS

Product Description

Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/HRSG Boilers for Glass Kilns

Description of Vertical Waste Heat  Recovery Boiler Units

The boiler is composed of superheated section,evaporator section,economizer and the attachments.the boiler transfer the exhaust gas heat to make 1.0MPa-2.5MPa steam.
the heat-transfer surface is composed of superheated section,evaporator section and economizer.these sections can raise water temperature,increase the steam output of the boiler and raise the effective utilization.

Features of of Vertical Waste Heat  Recovery Boiler Units:
the boiler is modular structure.every boiler has five section: inlet exhasust gas case,superheated section,evaporator section,economizer section and outlet exhaust gas case.these sections can be transported seperately and be assembled in the spot.

Advantage of Waste Heat  Recovery Boiler Units:
1, high cost performance ratio
2, self-clean
3, stand wear and tear
4, low energy consumption
5, well sealed
6, small weight and size

Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns

More Waste Heat Boiler Project Cases
Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns

Waste Heat Boiler parameter (for reference only, customization Available):
 
S.N Item Description
1 Exhaust gas flow 157000Nm3/h
2 Exhaust gas inlet 280ºC
3 Steam capacity 8.5t/h
4 Operating pressure (MPa) 0.8 MPa
5 Design pressure (MPa) 0.9 MPa
6 Rated steam temperature 175.4ºC
7 Exhaust gas outlet 160ºC
8 Pressure drop <1200Pa

Benefits of Waste Heat Boiler for Glass Kilns:
1.    Highly reliable in operation and robust in construction.
2.    Quick Payback Returns are achieved.
3.    One time investment with lifetime returns.
4.    No combustion, No emission hence Eco-friendly.
5.    Energy being put to use, which was getting wasted anyway.


Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper waste heat boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
 
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
 
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.


Kaineng Factory Area 

Flue Gas Waste Heat Boiler/Waste Heat Recovery Boiler/Hrsg Boilers for Glass Kilns


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now