3 Ton ~9 Ton Vertical Boiler Exhaust Gas Heat Recovery Steam Generation Units For Silicon Smelting Furnace
Description of Vertical Exhaust Gas Heat Recovery Steam Generation Boiler:
The waste heat steam generation boiler adopts forced circulation, that is, steam and water working fluid are driven by external force (feed water pump, hot water circulation pump) in the pipe. This can make the heating surface layout very compact and without any restrictions.
Heating surface of vertical exhaust gas heat recovery steam generator boiler usually consists of following parts: |
1 |
Economizer |
2 |
Evaporator |
3 |
Superheater |
The heat recovery steam generator boiler is installed on the flue duct of the Silicon Ore smelting electric arc furnace tail to achieve the purpose of recovering waste heat of flue gas and protecting the environment. It is of great practical significance to effectively reduce energy consumption and promote the sustainable development of renewable energy.
The Steam Capacity of The waste heat steam generator boiler:
Waste heat steam boiler (WHRB) are offered in tailor-made capacities as per customer requirement
Waste Heat Power Generation Boiler parameter (Below parameter is for reference only, Waste Heat Boiler Customization Available):
S.N |
Parameters |
Description |
1 |
Exhaust gas flow |
157000Nm3/h |
2 |
Exhaust gas inlet |
280ºC |
3 |
Steam capacity |
8.5t/h |
4 |
Operating pressure (MPa) |
0.8 MPa |
5 |
Design pressure (MPa) |
0.9 MPa |
6 |
Rated steam temperature |
175.4ºC |
7 |
Exhaust gas outlet |
160ºC |
8 |
Pressure drop |
<1200Pa |
Benefits of Vertical Heat Recovery Steam Generation Boiler for Ferroalley Furnace:
1.Highly reliable in operation and robust in construction.
2. Quick Payback Returns are achieved.
3. One time investment with lifetime returns.
4.No combustion, No emission hence Eco-friendly.
5.Energy being put to use, which was getting wasted anyway.
Transportation of Kaineng Heat Recovery Boiler :
Kaineng Service:
Pre-sale service:
Kaineng helps customer to choose the proper heat recovery steam boiler model according to different requirements of various industry. Before delivery we will provide boiler drawings, auxiliary equipment drawings, foundation drawing, layout drawing, etc.
In-sale service:
Kaineng keeps 24 hours online and keeps close contacts during the production process to ensure on time delivery with perfect finished product.
After-sale service:
1. provide full range of original quality spare parts.
2. Kaineng offer project guidance service, we will dispatch engineers to your local project site to guide the installation and commissioning.
3. Our engineers will held a training for boiler workers to ensure the safe operation.
4. Free maintenance and repair for one year and lifelong service.
Kaineng Factory Area